Alborz dam (Depo and loading of stone materials from Behnak mine, transportation and discharge at the dam site)

The contract was signed in 2007 between Ajin Mining Company and the company for the construction of a dam and irrigation facility (Sabir), which lasted for 6 months. The total embankment operation was 574,367 cubic meters.