Sarcheshmeh Tailing Dam

Participating partners in the project are Ajin Ferro Mining Company, Mobin Road Construction and Mining Company, and Olang Mining Company

Geographic Position

Sarcheshmeh copper mines is located at coordinates 55º52'20" East latitude and 29º56'40" North, longitude, 160 kilometers southwest of Kerman 50 kilometers away from Rafsanjan.  Average elevation of the site is 2620 meters with the highest point with the elevation of 3280 meters

Sarcheshmeh tailing dam is located on Rafsanjan - Sarcheshmeh road 40 kilometers away from Rafsanjan and 12 kilometers away from Sarcheshmeh

Weather Conditions

Area temperature varies from -15 to 33 degrees.  Annual precipitation in highland areas reach 550 millimeters and wind speed may approach 100 kilometers per hour

Construction Program

Operation to raise Sarcheshmeh tailing dam height includes the followings:

  • Phases 1 to 5 of the project preparation (TD1) was implemented by Ajin Ferro Mining Company from June 2003 to May 2005.  The operation involved 543,939 cubic meters of earth removal and 3,037,978 cubic meters of filling
  • Phases 6 and 7 of the project preparation (TD1) and phases 2 and 3 of the main dam construction was performed by Olang Mining Company from August 2005 to January 2009
  • Phases 3 and 4 of the main dam construction has been underway starting from September 2010 by Ajin Ferro Mining Company and Mobin Road Construction and Mining Company

List of mining equipments provided by partners

Bulldozers

D155

Loaders

470

Power Shovels

250

Shovels 470

Doosan

Dump Trucks

32toni Partnership

5

1

1

1

8

 

 

 

 

 

 

 

List of mining equipments provided by Ajin

Excavator ُSousan

(3.5 Inch)

Excavator Tamrak 1500 (4.5 Inch)   

Excavator Tamrak 400

(3 Inch)

Loaders

470

1

1(April)

1(April & May)

1