Extraction and loading and shipment of waste from the Meydok copper complex

The contract was signed in 1373 between Ajin Mining Company and the National Iranian Copper Industries Company and ended in 1382. The total tonnage was 54,710,000 tons.

Loading and transporting mineral and tailings of Sarcheshmeh Complex

The contract was signed in 1385 between Ajin Mining Company and Sarcheshmeh copper investment company and continued for 1 year. The total volume of the operation was 2,500,000 tons.

Mining and extraction of minerals in iron ore mines

The contract was signed in 1387 between Ajin Mining Company and Iran Mineral Processing and Processing Company and continued for 1 year. The tonnage of tailings was 657,353 tons and the minerals were 692,444 tons.

Excavation and leveling of the construction site of the smelting, refinery and acid complex of Sungun copper complex

The contract was signed in 2007 between Ajin Mining Company, Mobin, Olang and the National Iranian Copper Company for 14 months. The entire operation (iron and steel participation of Ajin and Mobin, Olang) is 11,720,000 tons, with Ajin’s share of 4,945,845 tons.

Construction of the first phase of the Damok sediment dam

The contract was signed in 1381 between Ajin Mining Company and Sarcheshmeh Copper Investment Company and continued for 4 years. The total excavation operation was 103,806 m 3 and the embankment was 4,241,998 m 3.

Construction and promotion of Sarcheshmeh copper sediment dams

The contract was signed in 2004 between Ajin Mining Company and Sarcheshmeh Copper Investment Company and continued for 2 years. The total excavation operation was 543,925 cubic meters and the excavation was 3,037,978 cubic meters.

Promotion of the second stage of the Meydok Complex sedimentation dam

The contract was completed in 2006 between Ajin Mining Company and the national Iranian copper company for more than 4 years. The total excavation operation was 170,734 cubic meters and the excavation was 5,756,085 cubic meters.

Promotion of the sediment block of the Sungun copper complex

The contract was signed in 2007 between Ajin Mining Company and the National Iranian Copper Industries Company and lasted for 14 months. The total promotion operation for the dam was 533,813 cubic meters.

Alborz dam (Depo and loading of stone materials from Behnak mine, transportation and discharge at the dam site)

The contract was signed in 2007 between Ajin Mining Company and the company for the construction of a dam and irrigation facility (Sabir), which lasted for 6 months. The total embankment operation was 574,367 cubic meters.

Promotion of the third and fourth stage of the Sarcheshmeh sedimentation dam

The contract was concluded in 2010 between Olang Mining Partnership, Mobin Road Construction Company, Ajin Mining Company and Iran National Copper Industry Co., and lasted for 4 years. The total excavation operation was 1,074,161 m 3 and the excavation was 6,159,212 m 3 is.

Other activities carried out by Ajin Mining Company include:

Collaboration at Nasabbas Dam Project (Kerman)
Preparation of rock materials for Gavoshan dam (Kurdistan)
Supply of stone materials for Shahid Kalantari Highway (West Azarbaijan)
Supply of stone materials for Sivand dam (Fars)
Operation of limestone mines in northern cement plants (Tehran)
Operation of limestone mines in Hegmatan Cement Factory (Hamedan)
Operation of limestone mines in Kurdistan Cement Factory (Kurdistan)
Extraction of Granite Stone by Controlled Blast Method